Why Construction Claims Fail Before They Are Submitted
A practical look at entitlement, notice, causation, records and quantum before a claim becomes a narrative.
Read the articleKeep clauses, correspondence and evidence connected in one defensible record — from first notice through final award.
Built for construction and infrastructure contract teams managing correspondence, variations, extension-of-time records, project chronology and claims documentation.
Evidence-first
Every answer traces to its source
Deadline-aware
Keep contractual dates in view
Governed by design
Control access across every project

Built for certainty
Replace scattered folders, inboxes and disconnected PDFs with a connected, audit-ready record — so every position is backed by the document.
Ask in plain language and pull the exact clause, letter or exhibit in seconds — every answer cited back to its source document and page, so your position is always defensible.
Draft sharp, contractual correspondence backed by cited clauses and precedent, through a governed input → draft → review → approval workflow — never an ungrounded word goes out the door.
Stay ahead of every notice, time-bar and claim across projects — so you never surrender an entitlement to a missed date.
How it works
A focused workflow keeps the right evidence, decision-makers and contractual dates together at every stage.
Upload contracts, correspondence and exhibits. ContraClaim scans, indexes and links them automatically.
Find the governing clause and supporting evidence in seconds — each answer cited to its source document and page.
Draft grounded replies and export a defensible, audit-ready trail for any review, negotiation or tribunal.
One connected platform
One connected set of modules across contracts, correspondence, claims, documents, stakeholders, access control and reporting. The context stays intact wherever work happens.
Upload contracts, run semantic clause search, ask cited questions, and generate structured appraisal reports covering obligations, risks and key dates.
A governed drafting workflow for contractual letters — input, strategy, draft, review, approval and completion — with reusable templates and a quality dashboard.
Register claims (EOT, variation, payment, loss & expense) and track response deadlines and contractual time-bars so entitlements are protected.
Upload, classify, tag, view, share and download project documents with rich metadata, references and structured folder browsing.
Scope every document, user, party and correspondence thread to the right organization and project.
Maintain parties, representatives, concerns and email groups used across project teams and correspondence.
Govern user, role, permission, project, document and download access, with SSO / OIDC sign-in support.
Track activity, correspondence status, organizational summaries, reports and analytics, plus a system health view.
Stay on top of work with a notification center, task tracking and team activity loops.
Security & governance
Tenant isolation, role-based permissions, audit-oriented activity, virus-scanned uploads and signed downloads are part of the workspace. Every contract answer remains grounded in your own record.
Every query, document and retrieval is scoped to its organization and project.
Granular control over users, roles, projects, documents, folders and downloads, with SSO / OIDC sign-in.
Generation, edits, approvals, downloads and exports are recorded for traceability.
Uploaded files are virus-scanned before they are stored or processed.
Files are served through permission checks and time-limited, signed access links.
Contract answers and appraisals cite the source document, clause and page — or state when information is not found.
From ContraClaim Insights
Read practical guidance on claims evidence, extension-of-time records, connected registers and responsible contractual drafting.
A practical look at entitlement, notice, causation, records and quantum before a claim becomes a narrative.
Read the articleThe contemporaneous project records that help an extension-of-time claim withstand review.
Read the articleHow source-grounded assistance and human review keep contractual drafting controlled.
Read the articleFAQ
Construction claims management software keeps the contract, notices, correspondence, evidence, deadlines and claim records connected so teams can trace each position back to the contemporaneous project record.
ContraClaim links contracts, clauses, correspondence, exhibits, claims and project records within the correct organisation and project scope. Search and contract Q&A cite the source document, clause and page.
Yes. Teams can maintain EOT claim records, notices, programme and delay evidence, response deadlines and contractual time-bars alongside the documents that support the entitlement.
Yes. Variation and other claim records sit alongside a governed contractual correspondence workflow covering input, strategy, drafting, review, approval and completion.
ContraClaim can assist with source-grounded drafting and contract retrieval. AI-generated content remains subject to human review and approval before it is treated as outgoing contractual correspondence.
No. ContraClaim organises the record and assists retrieval and drafting; it does not replace the judgement of the authorised contract, legal or commercial professionals responsible for the final position.
Data access is scoped by organisation and project, enforced through role-based permissions and controlled downloads. Uploaded files are virus-scanned and access activity is recorded for traceability.
Yes. Users, roles, documents, folders, downloads and project workspaces are permission-aware, with organisation and project scope applied to the records a user can retrieve or manage.
Request a demo
Book a 30-minute walkthrough with our contracts team. We will show how ContraClaim brings retrieval, drafting and deadlines together in one governed workspace.
Use this form for product enquiries, onboarding support and workspace access questions. Please do not include passwords or confidential claim details.